Reorder point arithmetic
The calculator first puts demand and lead time on the same time basis. Expected lead-time demand is average demand per period multiplied by the number of periods in the lead time. It then adds safety stock: reorder point = lead-time demand + safety stock. The result is an inventory threshold, not a calendar date or a purchase order.